EU UK UK & EU distributors

Case Studies from ECEX Air Intake Screens

Docklands Chiller Protection

Air Intake Screens at Data Centre

Brief: To install a filtration solution to prevent airborne debris from clogging the chiller coils without negatively impacting upon airflow. We were asked to attend site and carry out a survey of the existing Airedale chiller plant. Surrounded by trees and greenery, a range of issues are caused on site by pollen, leaves and associated airborne […]

Continue Reading

Major Pharmaceutical Company – Air intake screen installation

Situated close to one of the busiest commuter routes into London, this site was experiencing major issues with airborne debris being drawn into two of the buildings main AHUs and prematurely degrading the filter sets. Following the installation of air intake screens, filter changes were significantly reduced along with maintenance time and energy costs.

Continue Reading

BBC HQ – Air Intake Screen Installation to AHU inlets

“The installation of ECEX Air Intake Screens to the main fresh air supply AHU intakes at Broadcasting House been extremely successful. The great improvement in filter and plant cleanliness has also given a noticeable boost to some areas of the building where air quality had previously been an issue.” Engineering Services Manager, BBC The BBC’s […]

Continue Reading

Major UK Laboratory – Air Intake Screen Installation

Brief: To reduce the strain and risk of breakdown of new Geoclima chiller units within the plant area caused by insects and feathers clogging coils. Work carried out: ECEX Air Intake Screens were installed to all four sides of the unit from top to bottom, preventing any insects and particles from being drawn into the […]

Continue Reading

University In The South Of England – Air Intake Screen Installation to range of HVAC equipment

Brief: To install a filtration solution to prevent airborne debris from entering air intake systems without negatively impacting upon airflow. We were asked to attend site and carry out a full survey of the existing AHU and chiller plant. Surrounded by trees and greenery, a range of issues are caused on site by pollen, leaves […]

Continue Reading